![]() The electrical subs can provide a temporary service head with a circuit breaker box and phone jack. In many areas, the utility company runs phone lines along with electric lines, making this an opportunity to arrange for phone service. Forcing your builder to use a generator for power slows construction and is usually more costly. It’s always a good idea to have electrical service available once construction starts. See also 5 High-Tech Products for Your Log Home In most areas, health regulations require that licensed subcontractors install the septic systems. ![]() Because geology and soil conditions are important to the efficiency of a septic system and the purity of water returning to the soil, they are often closely monitored by local health departments. There, the water seeps back into the ground to be filtered by soil particles and purified by microorganisms. ![]() Septic systems generally consist of a tank and tile or perforated pipe to carry wastewater from the tank into a septic field consisting of a series of trenches or pits. Just as many log homes rely on wells for water, they also need septic systems to dispose of waste. The actual water line connecting the well to the house will be installed after the foundation is in. So, construction often begins with basic site prep, including clearing the land, constructing an entrance road and installing well and septic systems.ĭepending on depth and ground conditions, drilling a well can take anywhere from a few hours to several days. Finding the perfect location, choosing a log home provider and a floor plan, estimating costs, arranging contractors and securing financing are all grouped into what professional builders call “pre-construction activities.” Although thorough planning during the pre-construction phase paves the way for a smooth build, the real excitement begins the day you break ground and start turning your log home dream into a reality.Īlthough log homes can be built almost anywhere, most log home enthusiasts favor the privacy of rural locations. Preparing to build a log home can take anywhere from several months to a few years. Use this section as your map through the winding road that is custom log home construction. But, once you understand the sequence of events, the process is far less intimidating and easier to manage. It also can feel like a formidable challenge. Dewatering wells may also be installed.Building a log home is an exciting prospect. This can seal the site so that it isn't a muddy mess while the rest of the construction finishes. Groundwater removal - If groundwater is close to the surface or close to the basement of the new building, additional excavation may be required so that a sealing layer of concrete or clay can be placed.Historical societies love this, but owners and contractors hate the delay and added cost. Historical artifacts - If the area is thought to have had any sort of history, digging below existing buildings may uncover some of this history.A lot of bad things were just buried and forgotten. Environmental regulations have not always been as strict as they are now. Pollutant or Hazardous Waste removal - Especially if the old building was a factory (recently or at one time), there might be hazardous materials in the soil.Also this ensures that new piles will not be driven into old concrete, steel, or masonry. This means that enough material needs to be removed to ensure that the soil can be assured to have the required strength for the new structure. ![]() Depending on the age of the existing structure, complete plans may not even exist.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |